% Student exercise profile
 
:- set_prolog_flag(occurs_check, error). % disallow cyclic terms
 
:- use_module(library(clpq)).
 
 
jobshop3(Jobs, Schedule, Time) :- jobshop(3, 3, Jobs, Schedule, Time).
 
 
jobshop(N, M, Jobs, Schedule, Time) :-
 
% assert the given jobs have the expected size
 
length(Jobs, N),
 
Len is N*M, length(Schedule, Len),
 
maplist(inv_length(M), Jobs),
 
 
% assert that the tasks are done in the right order
 
Len1 is N-1,
 
numlist(0,Len1,L),
 
maplist(order_tasks(N, M, Jobs, Schedule, Time), L),
 
 
% TODO assert that jobs on machines do not overlap
 
 
minimize(Time).
 
 
inv_length(N, L) :- length(L, N).
 
 
order_tasks(N, M, Jobs, Schedule, Time, J) :-
 
% First task is done after 0 unit of time.
 
Pos is J*N,
 
nth0(Pos, Schedule, T0), {0 =< T0},
 
 
% Every task begin after the previous one is done.
 
nth0(J, Jobs, Tasks),
 
Len is M-2, numlist(0,Len,L),
 
maplist(order_tasks_(N, Tasks, Schedule, J), L),
 
 
% Last task finish before the total needed time.
 
Pos2 is J*N+M-1,
 
nth0(Pos2, Schedule, TM),
 
Pos3 is M-1,
 
nth0(Pos3, Tasks, (_,DM)),
 
{TM + DM =< Time}.
 
 
order_tasks_(N, Tasks, Schedule, J, T) :-
 
Pos is J*N+T,
 
nth0(Pos, Schedule, T0),
 
Pos1 is J*N+T+1,
 
nth0(Pos1, Schedule, T1),
 
nth0(T, Tasks, (_,D0)),
 
{T0+D0 =< T1}.
 
 
%?- jobshop3([[(0,3), (1,2), (2,2)],
 
% [(0,2), (2,1), (1,4)],
 
% [(0,4), (1,4), (2,3)]],
 
% Shedule,
 
% Time).
 